Stratus Consulting. 2002. Habitat-based replacement costs: An ecological valuation of the benefits of minimizing impingement and entrainment at the cooling water intake structure of the Pilgrim Power Generating Station in Plymouth, Massachusetts. Report for the U.S. EPA, Region 1.
- February 2002: Stratus Report (PDF)
Comments are Closed