File Library
Page 4/9
Stantec’s Elm Street Dam Site Reconnaissance Report
Site Reconnaissance, Preliminary Evaluation, and Opinion of Probable Cost for Dam Removal (prepared by Stantec Consulting Services Inc.) :
- Feb 2015: Elm St Dam Site Recon Report (PDF)
Fish Passage at Forge Pond Dam
Lake Street Culvert & Stormwater Improvements, Kingston MA:
- June 2015: 90% Design - Concept Plans (PDF)
- June 2015: 90% Design - Contract Specifications (PDF)
Forge Pond Dam Fish Passage Improvement Conceptual Design of Site Elements:
- March 2014: Final Report (DOC)
- March 2014: Final Report with appendices (PDF)
- March 2014: Appendix A Conceptual Drawings (PDF) March 2014: Conceptual Design Poster (PDF)
Economic Evaluation of the Costs and Benefits of the Forge Pond Dam Fish Passage Improvement Alternatives:
- October 2013: Final Economic Evaluation Report (PDF)
Feasibility Report:
- February 2014: Final Feasibility Report (PDF)
- February 2014: PowerPoint Presentation
Comments: Low-Level Radioactive Waste Storage